Dumpster pads and loading dock aprons in Des Moines are the hardest-working concrete on a commercial property, and usually the first pavement on the lot to fail.

New concrete dumpster pad and approach slab inside a masonry enclosure with steel gates and yellow bollards behind a brick commercial building

We replace worn-out asphalt and broken concrete in those spots with thick, reinforced slabs.

Request a site visit and itemized quote

Rather talk it through?

(515) 585-4111

Call anytime or send the form. Either way, you get a site visit and a written, itemized quote.

New concrete loading apron at two dock doors of a metal building, with a separate concrete dumpster pad

Why the Pavement Fails There

A front-load garbage truck stops in the same place every week, sets its forks, lifts a full container, and drops it again, so the load lands on the same few square feet over and over. Trucks backing to a dock turn their wheels while standing still, and trailer landing gear sits on two small feet. Asphalt ruts and breaks under that. Concrete built thick enough doesn't.

New concrete parking lot with saw-cut joints, striped stalls and a curbed tree island in front of a brick retail building

Dumpster Pads and Enclosures

We pour a pad under the containers and extend it out as an approach slab where the truck's front wheels stop, since that's where the weight lands when the forks lift. Enclosure walls or gates, bollards and a curb stop to keep containers off the back wall are often part of the same job.

Loading Dock Aprons

Dock aprons run from the dock face out far enough to carry a trailer's landing gear and the tractor's drive wheels. We slope the apron away from the building or to a trench drain so meltwater doesn't run under the dock door, and we tie the apron into the dock wall and the drive lane with joints planned to the layout.

Crew in hard hats and safety vests placing and screeding concrete for a parking lot from a mixer truck, with rebar laid in the next lane and a brick office building behind

Equipment Pads

We also pour exterior pads for transformers, generators, chillers, compressors and ground-mounted rooftop-unit equipment. These are sized to the equipment maker's drawings, with anchor bolts or embeds set where they're specified.

How We Keep a Site Running

Dumpster and dock work usually means coordinating with the hauler and the people who receive freight. We'll set the pour date with the property manager, arrange a temporary spot for containers, and give a clear date for when trucks can run on the new concrete.

New concrete pads holding a covered hot tub and an air conditioning unit beside a house with gray siding

Request a Bid

Send the address, photos of the area, and what trucks use it. Call (515) 585-4111 anytime or use the quote form.

Back to Des Moines Concrete Contractor.

New concrete dumpster pad and approach slab inside a masonry enclosure with steel gates and yellow bollards behind a brick commercial building

We'll reply by phone or email. Sending this form doesn't sign you up for text messages.

Call (515) 585-4111Request a Quote