Pole barn and machine shed concrete floors turn a gravel-floored building into a dry, clean shop, garage or storage barn.

Three workers screeding and floating a fresh concrete floor inside a steel-sided pole barn, the big door open to harvested cornfields and a grain bin

We pour floors in new and existing post-frame buildings on acreages around the Des Moines metro.

Request a site visit and itemized quote

Rather talk it through?

(515) 585-4111

Call anytime or send the form. Either way, you get a site visit and a written, itemized quote.

Crew screeding a concrete slab over wire mesh beside a new machine shed, with grain bins, a red barn and fields behind

Pouring Inside an Existing Building

Most of our pole barn floors go into buildings that are already standing, so access is the first thing we work out. Can a ready-mix truck back up to the big door? Is the door tall enough for a pump boom, or will the concrete be pumped through a line? Are the posts and girts protected from splash? We check all of it on the site visit, so pour day is all pouring.

Two finishers on knee boards hand-troweling a new concrete floor inside a garage shop with farmland outside

Base and Moisture

A gravel floor that's been driven on for years is often a decent start, but it's rarely flat or thick enough. We regrade, bring in and compact more stone where it's needed, and set a vapor barrier if the building will be heated or will store anything that shouldn't sweat. HomeGuide prices vapor barrier at $0.50 to $1.00 or more a square foot.

Worker running a plate compactor over a crushed stone base inside new driveway forms, with dark clay soil at the edges

Thickness for What's Parked There

A barn floor carrying a pickup and a lawn tractor is a very different slab from one carrying a loaded grain truck, a combine or a skid steer with a full bucket. HomeGuide notes that most slabs are 4 to 6 inches thick, with thicker slabs and steel for heavier loads. We set thickness and reinforcement for your heaviest machine and thicken the slab at the overhead door, where wheels hit it first.

Aprons and Wash Pads

The apron in front of the big door takes more abuse than the floor inside. It gets mud, frost and every turning tire. We pour aprons thick and slope them away from the building. A wash-down pad with a slope to one edge or a drain keeps equipment cleaning out of the barn.

New broom-finish concrete driveway with straight saw-cut joints leading to the two-car garage of a two-story home with tan siding and brick

Radiant Floor Heat

If you're planning in-floor heat, the tubing and insulation go down before the concrete, and the installer has to be on the schedule with us. Let us know early and we'll coordinate the pour around their work.

Smooth or Broom?

A smooth trowel finish is easy to sweep and good for a shop. A light broom finish gives traction in a barn where boots and tires come in wet. Many owners go smooth inside and broom on the apron.

Worker running a ride-on power trowel across a new warehouse floor slab beside tall storage racks

Get a Barn Floor Quote

Send the building size, door size, address and what will be parked inside. Call (515) 585-4111 anytime or use the quote form.

Back to Des Moines Concrete Contractor.

Three workers screeding and floating a fresh concrete floor inside a steel-sided pole barn, the big door open to harvested cornfields and a grain bin

We'll reply by phone or email. Sending this form doesn't sign you up for text messages.

Call (515) 585-4111Request a Quote