How Mudjacking Works
Mudjacking, also called slabjacking, goes like this: we drill a pattern of holes through the slab and pump a cement-based slurry underneath under pressure. The slurry fills the empty space first, then lifts the concrete a little at a time while we watch the level. Then we patch the holes. HomeGuide lists the slurry as water, soil, sand and cement, its injection holes at 1.5 to 2 inches, and says the surface is ready for use within about 24 hours.






