Skip to content
Call (515) 585-4111

Warehouse & Industrial Concrete Floors Des Moines - Shop & Distribution Slabs

Warehouse and industrial concrete floors in Des Moines carry forklifts, pallet racks and equipment every working day, and their joints and flatness decide how well the building runs.

Worker running a ride-on power trowel across a new warehouse floor slab beside tall storage racks

We pour new interior slabs and replace failed sections in existing buildings.

Request a site visit and itemized quote

Rather talk it through?

(515) 585-4111

Call anytime or send the form. Either way, you get a site visit and a written, itemized quote.

New concrete loading apron at two dock doors of a metal building, with a separate concrete dumpster pad

Built to the Engineer's Design

Industrial slabs are designed, not guessed. Thickness, concrete strength, reinforcing or fiber, vapor retarder and joint plan come from the structural engineer or the floor designer, and we build to that design. If you're replacing part of an existing floor and there are no drawings, we'll ask what loads run over it (forklift class, rack post loads, any machine bases) and bring in an engineer where the loads call for one.

Subgrade and Base

Most industrial floors that crack early fail from below. We proof-roll the subgrade to find soft areas, cut out and replace them, and compact a stone base to grade. Under conditioned space, a vapor retarder goes down to protect flooring, coatings and stored goods from moisture coming up through the slab.

Worker running a plate compactor over a crushed stone base inside new driveway forms, with dark clay soil at the edges

Joint Layout Around the Racks

Joints in a warehouse do two jobs. They control cracking, and they become the edges that forklift wheels hit thousands of times. Before the pour, we lay the saw-cut pattern over the rack plan so joints don't fall under rack legs or in the middle of the main forklift lanes. Then we saw on time, the same day the slab can take the saw, because late cuts are a common cause of random cracks.

Worker walking a concrete saw to cut a straight control joint in a new warehouse floor beside pallet racking and a roll-up door

Replacing Failed Sections

In older buildings the common problems are joints that have broken down along the edges, sections that have settled, and areas cracked under heavy equipment. We saw-cut out the damaged area, fix the base, dowel the new concrete to the existing slab where the design calls for it, and pour back. We schedule the work around your shifts and keep the rest of the floor working.

Skid steer loading broken slabs of an old driveway during tear-out while a worker stands by

Machine Bases and Pits

Heavy machinery may need a thickened base, an isolated pad or a pit poured into the floor. These are detailed by the equipment maker or an engineer, and we build them with the main slab or as standalone work.

Two finishers on knee boards hand-troweling a new concrete floor inside a garage shop with farmland outside

Request a Bid

Send the drawings or a description of the area, the loads and your schedule. Call (515) 585-4111 anytime or use the quote form.

Back to Des Moines Concrete Contractor. Need dock aprons outside? See loading dock aprons.

Worker running a ride-on power trowel across a new warehouse floor slab beside tall storage racks

We'll reply by phone or email. Sending this form doesn't sign you up for text messages.

Call (515) 585-4111Request a Quote